Skip to content

Strategic Systems Intelligence · SSIP

Eastern Equatoria

17 evidence records SSIP holds for Eastern Equatoria — location coverage across 10 datasets, each with its source, date and evidence state.

What SSIP holds for Eastern Equatoria

  • 17 evidence records
  • 15 carry a recorded value; 2 do not
  • 1 are declared gaps — recorded absences, which are findings in their own right
  • Evidence states present: 5 ANNOUNCED, 8 OPERATIONAL, 1 UNAVAILABLE, 3 DISPUTED
  • Drawn from 10 datasets: business.tenders, commercial.pipeline, canonical.projectsTenders, capital.opportunities, canonical.jurisdictions, canonical.counties, national.dataGaps, product.changes, national.contradictions, national.contradictionClaims

This is what SSIP holds, not a claim about what exists. Coverage is concentrated in Juba, Central Equatoria and the Nimule and Nile corridors; outside that scope the corpus is thin.

Evidence records

  • Torit–Kapoeta Road Chokepoint Gravelling, Drift Rebuild & Culverts (72km) — Ministry of Roads & Bridges has an open procurement notice: Torit–Kapoeta Road Chokepoint Gravelling, Drift Rebuild & Culverts (72km).
    Value: 4900000 USD
    Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
    Source: Ministry of Roads & Bridges Public Works Gazette 2026-09 · Publisher: Ministry of Roads & Bridges · Dated: 2026-09-08
  • Nesitu 100MW Solar Hybrid Energy Park & Substation EPC — Nesitu 100MW Solar Hybrid Energy Park & Substation EPC in Power & Energy, stage Under Construction.
    Value: 145000000 USD
    Evidence state: ANNOUNCED (Not asserted: no named source, no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
    Source: South Sudan Electricity Corporation (SSEC) · Date not recorded
  • Fulla Falls Hydroelectric Project (42 MW) Feasibility & EPC Procurement — Fulla Falls Hydroelectric Project (42 MW) Feasibility & EPC Procurement led by Ministry of Energy and Dams / South Sudan Electricity Corporation (SSEC).
    Value: 180000000 USD
    Evidence state: ANNOUNCED (Not asserted: no date, no review by a named person.) · Confidence: HIGH
    Source: AfDB South Sudan Country Strategy Paper & Ministry of Energy Tender Notice · Publisher: Ministry of Energy and Dams / South Sudan Electricity Corporation (SSEC) · Date not recorded
  • National Solarized Medical Cold Chain, Buffer Drug Inventory & Regional Blood Banks — National Solarized Medical Cold Chain, Buffer Drug Inventory & Regional Blood Banks — bankability FINANCE_READY.
    Value: 28000000 USD
    Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
    Source: SSIP capital assessment · Date not recorded
    Method: Readiness graded A.
  • Eastern Equatoria — Eastern Equatoria State — STATE, capital Torit.
    Value: 1210000 people (2026 estimate)
    Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: SSIP canonical jurisdiction register · Date not recorded
    Method: Population is an estimate, not a census count.
  • Torit County — Torit County (Eastern Equatoria) is classified OPEN for physical access and 3_CRISIS for food security in the canonical register.
    Value: 260000 people (estimate)
    Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: SSIP canonical jurisdiction register · Date not recorded
    Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification.
  • Magwi County — Magwi County (Eastern Equatoria) is classified OPEN for physical access and 2_STRESSED for food security in the canonical register.
    Value: 285000 people (estimate)
    Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: SSIP canonical jurisdiction register · Date not recorded
    Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification.
  • Kapoeta South County — Kapoeta South County (Eastern Equatoria) is classified OPEN for physical access and 4_EMERGENCY for food security in the canonical register.
    Value: 145000 people (estimate)
    Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: SSIP canonical jurisdiction register · Date not recorded
    Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification.
  • Kapoeta North County — Kapoeta North County (Eastern Equatoria) is classified CONSTRAINED for physical access and 4_EMERGENCY for food security in the canonical register.
    Value: 125000 people (estimate)
    Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: SSIP canonical jurisdiction register · Date not recorded
    Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification.
  • Kapoeta East County — Kapoeta East County (Eastern Equatoria) is classified CONSTRAINED for physical access and 4_EMERGENCY for food security in the canonical register.
    Value: 175000 people (estimate)
    Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: SSIP canonical jurisdiction register · Date not recorded
    Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification.
  • Ikotos County — Ikotos County (Eastern Equatoria) is classified CONSTRAINED for physical access and 3_CRISIS for food security in the canonical register.
    Value: 110000 people (estimate)
    Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: SSIP canonical jurisdiction register · Date not recorded
    Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification.
  • Budi County — Budi County (Eastern Equatoria) is classified CONSTRAINED for physical access and 3_CRISIS for food security in the canonical register.
    Value: 110000 people (estimate)
    Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: SSIP canonical jurisdiction register · Date not recorded
    Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification.
  • Artisanal Gold Production Volumes & Formal Export Clearing Declarations — SSIP does not hold Artisanal Gold Production Volumes & Formal Export Clearing Declarations for Eastern Equatoria State. This is a recorded absence, not a value of zero.
    Value: Not held. This is a recorded absence, not a value of zero.
    Evidence state: UNAVAILABLE (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
    Source: SSIP gap register · Date not recorded
    Method: Over 85% of artisanal gold mining is smuggled across the Kenya and Uganda borders without NRA royalty payments.
  • Nimule One-Stop Border Post Upgrades Single-Window Clearance; Truck Dwell Time Down to 18 Hours — National Revenue Authority (NRA) deployed digital automated weighbridges and unified EAC electronic manifest verification at Elegu/Nimule, clearing 340 stalled freight trucks within 24 hours.
    Value: 18 Average Truck Dwell Time (Hours)
    Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no confidence, no review by a named person.) · Confidence: INSUFFICIENT
    Source: NRA Customs Telemetry, EAC Single Customs Clearance Log, Nimule Border Observers · Dated: 2026-08-26
    Method: Before 64 hrs, after 18 hrs (-71.8%).
  • Nimule One-Stop Border Post (OSBP) Customs Revenue Clearance — Two sources make incompatible claims about Nimule One-Stop Border Post (OSBP) Customs Revenue Clearance. SSIP records both positions and resolves neither.
    Value: Not held. This is a recorded absence, not a value of zero.
    Evidence state: DISPUTED (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
    Source: SSIP contradiction register · Date not recorded
    Method: Divergence caused by legal duty exemptions granted to humanitarian agencies, diplomatic missions, and government infrastructure contractors, which are recorded as gross value by SSRA but not cash receipts.
  • Nimule One-Stop Border Post (OSBP) Customs Revenue Clearance — position A — Monthly non-oil customs revenue collected at Nimule border exceeded $14.2M USD equivalent in July 2026.
    Value: 14.2
    Evidence state: DISPUTED (Not asserted: no review by a named person.) · Confidence: HIGH
    Source: South Sudan Revenue Authority (SSRA) Fiscal Bulletin · Publisher: National Revenue Authority · Dated: 2026-08-10
    Method: Fiscal Ministry Report. The source states this figure as: "$14.2M / Month (Official Ledger)".
  • Nimule One-Stop Border Post (OSBP) Customs Revenue Clearance — position B — Outgoing cross-border cargo manifests from Elegu (Uganda) indicate goods value of $48M, implying effective collection rate of under 55% of statutory duties due to exemptions.
    Value: 7.8
    Evidence state: DISPUTED (Not asserted: no review by a named person.) · Confidence: MEDIUM
    Source: Uganda Revenue Authority (URA) & East African Business Council · Publisher: URA Customs Transit Portal / EABC · Dated: 2026-08-16
    Method: Regional Customs Mirror Audit. The source states this figure as: "$7.8M estimated net collected / 55% capture".

How to read this

Every figure on this page carries an evidence state — Verified, Operational, Announced, Estimated, Inferred, Disputed, Simulated, Reference or Unavailable — and each state has a stated definition. SSIP does not present an estimate as an observation, and it does not record a missing value as zero.

Read the methodology · Open the evidence ledger · See declared gaps

Related

Recorded relationships

12 relationships SSIP holds for this entity, each with the evidence state it is permitted to claim. A relationship is not a fact because it is drawn; it is a claim with a source.

Where

  • part of: Torit County [ANNOUNCED]
    Torit County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset.
  • part of: Magwi County [ANNOUNCED]
    Magwi County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset.
  • part of: Kapoeta South County [ANNOUNCED]
    Kapoeta South County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset.
  • part of: Kapoeta North County [ANNOUNCED]
    Kapoeta North County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset.
  • part of: Kapoeta East County [ANNOUNCED]
    Kapoeta East County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset.
  • part of: Ikotos County [ANNOUNCED]
    Ikotos County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset.
  • part of: Budi County [ANNOUNCED]
    Budi County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset.
  • located in: Fulla Falls Hydroelectric Project (42 MW) Feasibility & EPC Procurement [ANNOUNCED]
    The project record carries the canonical jurisdiction id "eastern-equatoria", which is a direct reference rather than a name match.
  • located in: Nesitu 100MW Solar Hybrid Energy Park & Substation EPC [ANNOUNCED]
    Pipeline location "Nesitu Industrial Corridor, Eastern Equatoria / Juba Border" names this jurisdiction.
  • located in: Torit–Kapoeta Road Chokepoint Gravelling, Drift Rebuild & Culverts (72km) [ANNOUNCED]
    Tender location "Eastern Equatoria (Torit to Kapoeta)" names this jurisdiction.
  • located in: Nimule-Juba Multimodal Trade Corridor & Inland Dry Port Customs Fast-Track Facility [ANNOUNCED]
    Recorded state and location name this jurisdiction.
  • located in: National Solarized Medical Cold Chain, Buffer Drug Inventory & Regional Blood Banks [ANNOUNCED]
    Recorded state and location name this jurisdiction.

Explore this in the knowledge graph

Elsewhere in SSIP

All evidence-backed pages · Organisations · Projects · Knowledge graph · Evidence ledger

Cite, check and correct

Cite as: “Eastern Equatoria — Location evidence”. Strategic Systems Intelligence. https://ssintelligence.online/locations/eastern-equatoria. Last updated . Carry the evidence state with any figure you quote.

Methodology · Sources · Corrections — if a record here is wrong, the corrections log is where it is fixed in public.