Eastern Equatoria
17 evidence records SSIP holds for Eastern Equatoria — location coverage across 10 datasets, each with its source, date and evidence state.
What SSIP holds for Eastern Equatoria
- 17 evidence records
- 15 carry a recorded value; 2 do not
- 1 are declared gaps — recorded absences, which are findings in their own right
- Evidence states present: 5 ANNOUNCED, 8 OPERATIONAL, 1 UNAVAILABLE, 3 DISPUTED
- Drawn from 10 datasets: business.tenders, commercial.pipeline, canonical.projectsTenders, capital.opportunities, canonical.jurisdictions, canonical.counties, national.dataGaps, product.changes, national.contradictions, national.contradictionClaims
This is what SSIP holds, not a claim about what exists. Coverage is concentrated in Juba, Central Equatoria and the Nimule and Nile corridors; outside that scope the corpus is thin.
Evidence records
-
Torit–Kapoeta Road Chokepoint Gravelling, Drift Rebuild & Culverts (72km) — Ministry of Roads & Bridges has an open procurement notice: Torit–Kapoeta Road Chokepoint Gravelling, Drift Rebuild & Culverts (72km).
Value: 4900000 USD
Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
Source: Ministry of Roads & Bridges Public Works Gazette 2026-09 · Publisher: Ministry of Roads & Bridges · Dated: 2026-09-08 -
Nesitu 100MW Solar Hybrid Energy Park & Substation EPC — Nesitu 100MW Solar Hybrid Energy Park & Substation EPC in Power & Energy, stage Under Construction.
Value: 145000000 USD
Evidence state: ANNOUNCED (Not asserted: no named source, no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
Source: South Sudan Electricity Corporation (SSEC) · Date not recorded -
Fulla Falls Hydroelectric Project (42 MW) Feasibility & EPC Procurement — Fulla Falls Hydroelectric Project (42 MW) Feasibility & EPC Procurement led by Ministry of Energy and Dams / South Sudan Electricity Corporation (SSEC).
Value: 180000000 USD
Evidence state: ANNOUNCED (Not asserted: no date, no review by a named person.) · Confidence: HIGH
Source: AfDB South Sudan Country Strategy Paper & Ministry of Energy Tender Notice · Publisher: Ministry of Energy and Dams / South Sudan Electricity Corporation (SSEC) · Date not recorded -
National Solarized Medical Cold Chain, Buffer Drug Inventory & Regional Blood Banks — National Solarized Medical Cold Chain, Buffer Drug Inventory & Regional Blood Banks — bankability FINANCE_READY.
Value: 28000000 USD
Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: SSIP capital assessment · Date not recorded
Method: Readiness graded A. -
Eastern Equatoria — Eastern Equatoria State — STATE, capital Torit.
Value: 1210000 people (2026 estimate)
Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
Source: SSIP canonical jurisdiction register · Date not recorded
Method: Population is an estimate, not a census count. -
Torit County — Torit County (Eastern Equatoria) is classified OPEN for physical access and 3_CRISIS for food security in the canonical register.
Value: 260000 people (estimate)
Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
Source: SSIP canonical jurisdiction register · Date not recorded
Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification. -
Magwi County — Magwi County (Eastern Equatoria) is classified OPEN for physical access and 2_STRESSED for food security in the canonical register.
Value: 285000 people (estimate)
Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
Source: SSIP canonical jurisdiction register · Date not recorded
Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification. -
Kapoeta South County — Kapoeta South County (Eastern Equatoria) is classified OPEN for physical access and 4_EMERGENCY for food security in the canonical register.
Value: 145000 people (estimate)
Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
Source: SSIP canonical jurisdiction register · Date not recorded
Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification. -
Kapoeta North County — Kapoeta North County (Eastern Equatoria) is classified CONSTRAINED for physical access and 4_EMERGENCY for food security in the canonical register.
Value: 125000 people (estimate)
Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
Source: SSIP canonical jurisdiction register · Date not recorded
Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification. -
Kapoeta East County — Kapoeta East County (Eastern Equatoria) is classified CONSTRAINED for physical access and 4_EMERGENCY for food security in the canonical register.
Value: 175000 people (estimate)
Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
Source: SSIP canonical jurisdiction register · Date not recorded
Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification. -
Ikotos County — Ikotos County (Eastern Equatoria) is classified CONSTRAINED for physical access and 3_CRISIS for food security in the canonical register.
Value: 110000 people (estimate)
Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
Source: SSIP canonical jurisdiction register · Date not recorded
Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification. -
Budi County — Budi County (Eastern Equatoria) is classified CONSTRAINED for physical access and 3_CRISIS for food security in the canonical register.
Value: 110000 people (estimate)
Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
Source: SSIP canonical jurisdiction register · Date not recorded
Method: Register entry. Population is an estimate, not a census count, and the register records no date for the access or food security classification. -
Artisanal Gold Production Volumes & Formal Export Clearing Declarations — SSIP does not hold Artisanal Gold Production Volumes & Formal Export Clearing Declarations for Eastern Equatoria State. This is a recorded absence, not a value of zero.
Value: Not held. This is a recorded absence, not a value of zero.
Evidence state: UNAVAILABLE (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: SSIP gap register · Date not recorded
Method: Over 85% of artisanal gold mining is smuggled across the Kenya and Uganda borders without NRA royalty payments. -
Nimule One-Stop Border Post Upgrades Single-Window Clearance; Truck Dwell Time Down to 18 Hours — National Revenue Authority (NRA) deployed digital automated weighbridges and unified EAC electronic manifest verification at Elegu/Nimule, clearing 340 stalled freight trucks within 24 hours.
Value: 18 Average Truck Dwell Time (Hours)
Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: NRA Customs Telemetry, EAC Single Customs Clearance Log, Nimule Border Observers · Dated: 2026-08-26
Method: Before 64 hrs, after 18 hrs (-71.8%). -
Nimule One-Stop Border Post (OSBP) Customs Revenue Clearance — Two sources make incompatible claims about Nimule One-Stop Border Post (OSBP) Customs Revenue Clearance. SSIP records both positions and resolves neither.
Value: Not held. This is a recorded absence, not a value of zero.
Evidence state: DISPUTED (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: SSIP contradiction register · Date not recorded
Method: Divergence caused by legal duty exemptions granted to humanitarian agencies, diplomatic missions, and government infrastructure contractors, which are recorded as gross value by SSRA but not cash receipts. -
Nimule One-Stop Border Post (OSBP) Customs Revenue Clearance — position A — Monthly non-oil customs revenue collected at Nimule border exceeded $14.2M USD equivalent in July 2026.
Value: 14.2
Evidence state: DISPUTED (Not asserted: no review by a named person.) · Confidence: HIGH
Source: South Sudan Revenue Authority (SSRA) Fiscal Bulletin · Publisher: National Revenue Authority · Dated: 2026-08-10
Method: Fiscal Ministry Report. The source states this figure as: "$14.2M / Month (Official Ledger)". -
Nimule One-Stop Border Post (OSBP) Customs Revenue Clearance — position B — Outgoing cross-border cargo manifests from Elegu (Uganda) indicate goods value of $48M, implying effective collection rate of under 55% of statutory duties due to exemptions.
Value: 7.8
Evidence state: DISPUTED (Not asserted: no review by a named person.) · Confidence: MEDIUM
Source: Uganda Revenue Authority (URA) & East African Business Council · Publisher: URA Customs Transit Portal / EABC · Dated: 2026-08-16
Method: Regional Customs Mirror Audit. The source states this figure as: "$7.8M estimated net collected / 55% capture".
How to read this
Every figure on this page carries an evidence state — Verified, Operational, Announced, Estimated, Inferred, Disputed, Simulated, Reference or Unavailable — and each state has a stated definition. SSIP does not present an estimate as an observation, and it does not record a missing value as zero.
Read the methodology · Open the evidence ledger · See declared gaps
Related
- Central Equatoria (Location)
- business.tenders (Dataset)
- Power & Energy (Sector)
- Transport & Logistics (Sector)
- Upper Nile (Location)
- Housing & Construction (Sector)
- Western Equatoria (Location)
- commercial.pipeline (Dataset)
- Health (Sector)
- Western Bahr el Ghazal (Location)
- canonical.projectsTenders (Dataset)
- Governance & Administration (Sector)
Recorded relationships
12 relationships SSIP holds for this entity, each with the evidence state it is permitted to claim. A relationship is not a fact because it is drawn; it is a claim with a source.
Where
- part of: Torit County [ANNOUNCED]
Torit County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset. - part of: Magwi County [ANNOUNCED]
Magwi County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset. - part of: Kapoeta South County [ANNOUNCED]
Kapoeta South County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset. - part of: Kapoeta North County [ANNOUNCED]
Kapoeta North County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset. - part of: Kapoeta East County [ANNOUNCED]
Kapoeta East County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset. - part of: Ikotos County [ANNOUNCED]
Ikotos County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset. - part of: Budi County [ANNOUNCED]
Budi County is listed as a county of Eastern Equatoria in SSIP's canonical jurisdictions dataset. - located in: Fulla Falls Hydroelectric Project (42 MW) Feasibility & EPC Procurement [ANNOUNCED]
The project record carries the canonical jurisdiction id "eastern-equatoria", which is a direct reference rather than a name match. - located in: Nesitu 100MW Solar Hybrid Energy Park & Substation EPC [ANNOUNCED]
Pipeline location "Nesitu Industrial Corridor, Eastern Equatoria / Juba Border" names this jurisdiction. - located in: Torit–Kapoeta Road Chokepoint Gravelling, Drift Rebuild & Culverts (72km) [ANNOUNCED]
Tender location "Eastern Equatoria (Torit to Kapoeta)" names this jurisdiction. - located in: Nimule-Juba Multimodal Trade Corridor & Inland Dry Port Customs Fast-Track Facility [ANNOUNCED]
Recorded state and location name this jurisdiction. - located in: National Solarized Medical Cold Chain, Buffer Drug Inventory & Regional Blood Banks [ANNOUNCED]
Recorded state and location name this jurisdiction.
Elsewhere in SSIP
All evidence-backed pages · Organisations · Projects · Knowledge graph · Evidence ledger
Cite, check and correct
Cite as: “Eastern Equatoria — Location evidence”. Strategic Systems Intelligence. https://ssintelligence.online/locations/eastern-equatoria. Last updated . Carry the evidence state with any figure you quote.
Methodology · Sources · Corrections — if a record here is wrong, the corrections log is where it is fixed in public.