Power & Energy
23 evidence records SSIP holds for Power & Energy — sector coverage across 12 datasets, each with its source, date and evidence state.
What SSIP holds for Power & Energy
- 23 evidence records
- 20 carry a recorded value; 3 do not
- 1 are declared gaps — recorded absences, which are findings in their own right
- Evidence states present: 14 ANNOUNCED, 1 UNAVAILABLE, 1 INFERRED, 1 ESTIMATED, 6 DISPUTED
- Drawn from 12 datasets: business.tenders, business.capitalEvents, commercial.pipeline, canonical.projectsTenders, capital.opportunities, national.dataGaps, capital.funders, commercial.organizationProfiles, commercial.opportunities, business.costBenchmarks, national.contradictions, national.contradictionClaims
This is what SSIP holds, not a claim about what exists. Coverage is concentrated in Juba, Central Equatoria and the Nimule and Nile corridors; outside that scope the corpus is thin.
Evidence records
-
Juba International Airport (JIA) Solar Rooftop & Microgrid EPC — Ministry of Transport / South Sudan Civil Aviation Authority (SSCAA) has an open procurement notice: Juba International Airport (JIA) Solar Rooftop & Microgrid EPC.
Value: 8500000 USD
Evidence state: ANNOUNCED (Not asserted: no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
Source: Ministry of Transport Public Procurement Directorate Ref: MOT/SSCAA/2026/09 · Publisher: Ministry of Transport / South Sudan Civil Aviation Authority (SSCAA) · Dated: 2026-08-28 -
AfDB Board Approves $145M First Tranche for Nesitu 100MW Solar Park — African Development Bank (AfDB) & Climate Investment Fund — AfDB Board Approves $145M First Tranche for Nesitu 100MW Solar Park.
Value: 145000000 USD
Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no review by a named person.) · Confidence: HIGH
Source: AfDB Project Document Ref: P-SS-FZ0-004 / Official Communiqué · Dated: 2026-09-08 -
Nesitu 100MW Solar Hybrid Energy Park & Substation EPC — Nesitu 100MW Solar Hybrid Energy Park & Substation EPC in Power & Energy, stage Under Construction.
Value: 145000000 USD
Evidence state: ANNOUNCED (Not asserted: no named source, no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
Source: South Sudan Electricity Corporation (SSEC) · Date not recorded -
Public Tender: Juba International Airport (JIA) Solar Rooftop & Microgrid EPC — Public Tender: Juba International Airport (JIA) Solar Rooftop & Microgrid EPC in Power & Energy, stage Tender Open.
Value: 8500000 USD
Evidence state: ANNOUNCED (Not asserted: no named source, no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
Source: SSCAA Procurement Committee · Date not recorded
Method: Value estimated by SSIP, not published by the sponsor. -
Public Tender: Juba City Solar-Powered Streetlight Installation (Phase IV) — Public Tender: Juba City Solar-Powered Streetlight Installation (Phase IV) in Power & Energy, stage Tender Open.
Value: 3600000 USD
Evidence state: ANNOUNCED (Not asserted: no named source, no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
Source: CES Ministry of Physical Planning & Infrastructure · Date not recorded -
Fulla Falls Hydroelectric Project (42 MW) Feasibility & EPC Procurement — Fulla Falls Hydroelectric Project (42 MW) Feasibility & EPC Procurement led by Ministry of Energy and Dams / South Sudan Electricity Corporation (SSEC).
Value: 180000000 USD
Evidence state: ANNOUNCED (Not asserted: no date, no review by a named person.) · Confidence: HIGH
Source: AfDB South Sudan Country Strategy Paper & Ministry of Energy Tender Notice · Publisher: Ministry of Energy and Dams / South Sudan Electricity Corporation (SSEC) · Date not recorded -
Juba Metropolitan 40MW Solar PV + 60MWh BESS Mini-Grid & Feeder Modernization — Juba Metropolitan 40MW Solar PV + 60MWh BESS Mini-Grid & Feeder Modernization — bankability FINANCE_READY.
Value: 68000000 USD
Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: SSIP capital assessment · Date not recorded
Method: Readiness graded A. -
Urban Commercial Diesel Generator Capacity & Industrial Tariff Schedules — SSIP does not hold Urban Commercial Diesel Generator Capacity & Industrial Tariff Schedules for Western Bahr el Ghazal State. This is a recorded absence, not a value of zero.
Value: Not held. This is a recorded absence, not a value of zero.
Evidence state: UNAVAILABLE (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: SSIP gap register · Date not recorded
Method: Wau town grid is fragmented into private microgrid clusters without unified metering or regulatory oversight. -
World Bank Group (IDA / IFC / MIGA) — World Bank Group (IDA / IFC / MIGA) states a mandate covering 6 sector(s) in 1 geography(ies). A stated mandate is not money deployed.
Value: 480000000 USD
Evidence state: ANNOUNCED (Not asserted: no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: World Bank Group (IDA / IFC / MIGA) · Publisher: World Bank Group (IDA / IFC / MIGA) · Date not recorded
Method: Poverty eradication and shared prosperity in Fragile, Conflict and Violence (FCV) states via IDA grants, concessional financing, and private sector mobilization. -
African Development Bank Group (AfDB / ADF) — African Development Bank Group (AfDB / ADF) states a mandate covering 4 sector(s) in 1 geography(ies). A stated mandate is not money deployed.
Value: 165000000 USD
Evidence state: ANNOUNCED (Not asserted: no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: African Development Bank Group (AfDB / ADF) · Publisher: African Development Bank Group (AfDB / ADF) · Date not recorded
Method: High 5s priorities: Light up and Power Africa, Feed Africa, Industrialize Africa, Integrate Africa, and Improve the Quality of Life for the People of Africa. -
Green Climate Fund (GCF) — Green Climate Fund (GCF) states a mandate covering 3 sector(s) in 1 geography(ies). A stated mandate is not money deployed.
Value: 45000000 USD
Evidence state: ANNOUNCED (Not asserted: no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: Green Climate Fund (GCF) · Publisher: Green Climate Fund (GCF) · Date not recorded
Method: Catalyzing climate finance for low-emission and climate-resilient development, prioritizing fragile LDCs and SIDS with highly concessional resources. -
USAID & Power Africa / Feed the Future — USAID & Power Africa / Feed the Future states a mandate covering 4 sector(s) in 1 geography(ies). A stated mandate is not money deployed.
Value: 310000000 USD
Evidence state: ANNOUNCED (Not asserted: no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: USAID & Power Africa / Feed the Future · Publisher: USAID & Power Africa / Feed the Future · Date not recorded
Method: Promoting self-reliance, humanitarian relief, community resilience, private sector enterprise, and clean energy transition through non-reimbursable grants. -
International Finance Corporation (IFC) & MIGA — International Finance Corporation (IFC) & MIGA states a mandate covering 3 sector(s) in 1 geography(ies). A stated mandate is not money deployed.
Value: 35000000 USD
Evidence state: ANNOUNCED (Not asserted: no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: International Finance Corporation (IFC) & MIGA · Publisher: International Finance Corporation (IFC) & MIGA · Date not recorded
Method: Private sector arm of the World Bank Group providing equity, quasi-equity, commercial loans, and MIGA political risk guarantees in fragile frontier markets. -
Ezra Construction & Development Group / JEDCO — Ezra Construction & Development Group / JEDCO — Principal private power concessionaire in Juba operating the 33MW heavy fuel oil (HFO) thermal power plant and co-managing the Juba Electricity Distribution Company (JEDCO) grid concession..
Value: 48 USD
Evidence state: ANNOUNCED (Not asserted: no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: Ezra Construction & Development Group / JEDCO (POTENTIAL_CUSTOMER) · Publisher: Ezra Construction & Development Group / JEDCO · Dated: 2026-08-22 -
Trinity Energy Limited — Trinity Energy Limited — Largest indigenous energy and petroleum marketing company in South Sudan, commanding over 40% retail fuel market share with diversified interests in fintech (m-GURUSH) and logistics..
Value: 120 USD
Evidence state: ANNOUNCED (Not asserted: no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: Trinity Energy Limited (COMPETITOR) · Publisher: Trinity Energy Limited · Dated: 2026-08-25 -
Commercial & Industrial (C&I) Solar-Storage PPA for Warehouses & Hotels — Commercial & Industrial (C&I) Solar-Storage PPA for Warehouses & Hotels: Commercial businesses and hotels in Juba face diesel generation costs of $0.42 to $0.56 per kWh, with frequent fuel logistics delays and high maintenance downtime on generator sets..
Value: $450K – $1.8M (Modular 250kWp - 1.2MWp systems)
Evidence state: INFERRED (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
Source: Ministry of Energy & Dams Strategic Energy Masterplan 2025/2026 · Date not recorded
Method: Field survey across 48 commercial facilities in Hai Malakal, Tongping, and Industrial Area shows average diesel fuel spend of $14,000/month per facility, with 89% expressing immediate willingness to enter 5-year solar PPA at $0.24-$0.28/kWh. -
Commercial Diesel Generator Operating Cost (Blended Fuel + O&M) — Commercial Diesel Generator Operating Cost (Blended Fuel + O&M) is recorded at $0.44 / kWh as of 2026-09-09, with a stated 30-day change of 4.2%.
Value: 0.44 USD / kWh
Evidence state: ESTIMATED (Not asserted: no source locator (reference, URL or publisher), no review by a named person.) · Confidence: HIGH
Source: Juba Chamber of Commerce Industrial Energy Audit · Dated: 2026-09-09
Method: Survey benchmark. Historical trend recorded as RISING. -
Daily Crude Oil Export Revenue & Production Throughput — Two sources make incompatible claims about Daily Crude Oil Export Revenue & Production Throughput. SSIP records both positions and resolves neither.
Value: Not held. This is a recorded absence, not a value of zero.
Evidence state: DISPUTED (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: SSIP contradiction register · Date not recorded
Method: The Ministry reports gross wellhead extracted volume including water cut and in-line pipeline storage, whereas operating consortia report net fiscalized crude delivered to maritime tankers after deducting pipeline transit fees in kind. -
Bentiu Local Petroleum Refinery Operational Capacity — Two sources make incompatible claims about Bentiu Local Petroleum Refinery Operational Capacity. SSIP records both positions and resolves neither.
Value: Not held. This is a recorded absence, not a value of zero.
Evidence state: DISPUTED (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: SSIP contradiction register · Date not recorded
Method: Trial testing runs of distillation units were publicly announced as full commercial operations before mandatory emissions and safety certifications were finalized. -
Daily Crude Oil Export Revenue & Production Throughput — position A — Total daily crude production across all blocks is 142,000 bpd with export revenues averaging $7.8M/day.
Value: 142000
Evidence state: DISPUTED (Not asserted: no review by a named person.) · Confidence: MEDIUM
Source: Ministry of Petroleum Official Monthly Release · Publisher: Ministry of Petroleum (MoP) · Dated: 2026-08-20
Method: Government Press Briefing. The source states this figure as: "142,000 bpd ($7.8M/day gross)". -
Daily Crude Oil Export Revenue & Production Throughput — position B — Physical metered liftings at Bashayer terminal average 124,000 bpd net after deducting 18,000 bpd for Sudan transit fees & pipeline thermal line-fill.
Value: 124000
Evidence state: DISPUTED (Not asserted: no review by a named person.) · Confidence: HIGH
Source: DPOC/GPOC Consortium Marine Bill of Lading & Metering Log · Publisher: Joint Operating Companies & Marine Auditors · Dated: 2026-08-24
Method: Technical Metering Dispatch. The source states this figure as: "124,000 bpd net export". -
Bentiu Local Petroleum Refinery Operational Capacity — position A — Bentiu modular refinery has resumed operations at 5,000 bpd capacity supplying diesel to local state vehicles and humanitarian power generators.
Value: 5000
Evidence state: DISPUTED (Not asserted: no review by a named person.) · Confidence: LOW
Source: Unity State Information Ministry Press Briefing · Publisher: Unity State Government / SNP Refinery JV · Dated: 2026-08-14
Method: State Government Announcement. The source states this figure as: "5,000 bpd operational capacity". -
Bentiu Local Petroleum Refinery Operational Capacity — position B — Refinery unit is in cold standby undergoing boiler tube replacement; local diesel sales reflect trucked supplies from Renk/Sudan border rather than local refining.
Value: 0
Evidence state: DISPUTED (Not asserted: no review by a named person.) · Confidence: HIGH
Source: UNMISS Field Environmental Team & Nilepet Engineering Audit · Publisher: UNMISS / National Oil Corporation · Dated: 2026-08-22
Method: On-Site Technical Inspection. The source states this figure as: "0 bpd (Cold Standby / Maintenance)".
How to read this
Every figure on this page carries an evidence state — Verified, Operational, Announced, Estimated, Inferred, Disputed, Simulated, Reference or Unavailable — and each state has a stated definition. SSIP does not present an estimate as an observation, and it does not record a missing value as zero.
Read the methodology · Open the evidence ledger · See declared gaps
Related
- Central Equatoria (Location)
- business.tenders (Dataset)
- Jonglei (Location)
- Upper Nile (Location)
- Eastern Equatoria (Location)
- business.capitalEvents (Dataset)
- commercial.pipeline (Dataset)
- Western Bahr el Ghazal (Location)
- canonical.projectsTenders (Dataset)
- Unity (Location)
- Northern Bahr el Ghazal (Location)
- SSIP gap register (Source)
Recorded relationships
19 relationships SSIP holds for this entity, each with the evidence state it is permitted to claim. A relationship is not a fact because it is drawn; it is a claim with a source.
Sector
- in sector: Fulla Falls Hydroelectric Project (42 MW) Feasibility & EPC Procurement [ANNOUNCED]
The project record classifies this project in "Energy & Power Generation". - in sector: Nesitu 100MW Solar Hybrid Energy Park & Substation EPC [ANNOUNCED]
The pipeline record classifies this in "Power & Energy". - in sector: Public Tender: Juba International Airport (JIA) Solar Rooftop & Microgrid EPC [ANNOUNCED]
The pipeline record classifies this in "Power & Energy". - in sector: Public Tender: Juba City Solar-Powered Streetlight Installation (Phase IV) [ANNOUNCED]
The pipeline record classifies this in "Power & Energy". - in sector: AfDB Board Approves $145M First Tranche for Nesitu 100MW Solar Park [ANNOUNCED]
The capital event record classifies it in "Energy & Solar". - in sector: Juba International Airport (JIA) Solar Rooftop & Microgrid EPC [ANNOUNCED]
The tender record classifies it in "Power & Energy". - targets sector: World Bank (IDA) [ANNOUNCED, announced]
"World Bank Group (IDA / IFC / MIGA)" lists "RENEWABLE_ENERGY_MINIGRID" among its target sectors. This is a stated mandate, not money deployed. - targets sector: African Development Bank Group [ANNOUNCED, announced]
"African Development Bank Group (AfDB / ADF)" lists "RENEWABLE_ENERGY_MINIGRID" among its target sectors. This is a stated mandate, not money deployed. - targets sector: Green Climate Fund (GCF) [ANNOUNCED, announced]
"Green Climate Fund (GCF)" lists "RENEWABLE_ENERGY_MINIGRID" among its target sectors. This is a stated mandate, not money deployed. - targets sector: Trade and Development Bank (TDB Group) [ANNOUNCED, announced]
"Trade and Development Bank (TDB Group)" lists "RENEWABLE_ENERGY_MINIGRID" among its target sectors. This is a stated mandate, not money deployed. - targets sector: USAID & Power Africa [ANNOUNCED, announced]
"USAID & Power Africa / Feed the Future" lists "RENEWABLE_ENERGY_MINIGRID" among its target sectors. This is a stated mandate, not money deployed. - targets sector: International Finance Corporation (IFC) & MIGA [ANNOUNCED, announced]
"International Finance Corporation (IFC) & MIGA" lists "RENEWABLE_ENERGY_MINIGRID" among its target sectors. This is a stated mandate, not money deployed. - in sector: Ezra Construction & Development Group [ANNOUNCED]
The organisation profile classifies it in "Power & Infrastructure". - in sector: Trinity Energy Limited [ANNOUNCED]
The organisation profile classifies it in "Energy, Petroleum & Logistics". - in sector: Juba Metropolitan 40MW Solar PV + 60MWh BESS Mini-Grid & Feeder Modernization [ANNOUNCED]
The capital opportunity record categorises it as "RENEWABLE_ENERGY_MINIGRID". - in sector: Commercial & Industrial (C&I) Solar-Storage PPA for Warehouses & Hotels [INFERRED]
The opportunity record classifies it in "Energy & Solar". - competes in: Ezra Power (Thermal Grid) [INFERRED]
"Ezra Power (Thermal Grid)" is named as a key incumbent in the market analysis for "Commercial & Industrial (C&I) Solar-Storage PPA for Warehouses & Hotels". This is an analyst's reading of the market, not an attributed statement about the company. - competes in: JEDCO (Distribution) [INFERRED]
"JEDCO (Distribution)" is named as a key incumbent in the market analysis for "Commercial & Industrial (C&I) Solar-Storage PPA for Warehouses & Hotels". This is an analyst's reading of the market, not an attributed statement about the company. - competes in: Local diesel generator rental operators [INFERRED]
"Local diesel generator rental operators" is named as a key incumbent in the market analysis for "Commercial & Industrial (C&I) Solar-Storage PPA for Warehouses & Hotels". This is an analyst's reading of the market, not an attributed statement about the company.
Elsewhere in SSIP
All evidence-backed pages · Organisations · Projects · Knowledge graph · Evidence ledger
Topic hubs
Cite, check and correct
Cite as: “Power & Energy — Sector evidence”. Strategic Systems Intelligence. https://ssintelligence.online/sectors/power-energy. Last updated . Carry the evidence state with any figure you quote.
Methodology · Sources · Corrections — if a record here is wrong, the corrections log is where it is fixed in public.