Skip to content

Strategic Systems Intelligence · SSIP

Transport & Logistics

21 evidence records SSIP holds for Transport & Logistics — sector coverage across 13 datasets, each with its source, date and evidence state.

What SSIP holds for Transport & Logistics

  • 21 evidence records
  • 18 carry a recorded value; 3 do not
  • Evidence states present: 15 ANNOUNCED, 1 INFERRED, 1 OPERATIONAL, 1 ESTIMATED, 3 DISPUTED
  • Drawn from 13 datasets: business.tenders, business.capitalEvents, commercial.pipeline, canonical.projectsTenders, capital.opportunities, capital.funders, commercial.organizationProfiles, canonical.suppliers, commercial.opportunities, product.changes, business.costBenchmarks, national.contradictions, national.contradictionClaims

This is what SSIP holds, not a claim about what exists. Coverage is concentrated in Juba, Central Equatoria and the Nimule and Nile corridors; outside that scope the corpus is thin.

Evidence records

  • Nimule-Juba Freight Corridor Electronic Cargo Tracking & Weighbridge Upgrade — South Sudan Revenue Authority (SSRA) Customs Division has an open procurement notice: Nimule-Juba Freight Corridor Electronic Cargo Tracking & Weighbridge Upgrade.
    Value: 6200000 USD
    Evidence state: ANNOUNCED (Not asserted: no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
    Source: SSRA Customs Directorate Tender Bulletin 2026-Q3 · Publisher: South Sudan Revenue Authority (SSRA) Customs Division · Dated: 2026-09-02
  • Dry Season Bulk River Barge & Truck Fleet Transport Long-Term Agreement (LTA) — World Food Programme (WFP) South Sudan Logistics Cluster has an open procurement notice: Dry Season Bulk River Barge & Truck Fleet Transport Long-Term Agreement (LTA).
    Value: 14500000 USD
    Evidence state: ANNOUNCED (Not asserted: no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
    Source: UN Global Marketplace Ref: UNGM-928411 / WFP Juba Logistics Office · Publisher: World Food Programme (WFP) South Sudan Logistics Cluster · Dated: 2026-09-05
  • TradeMark Africa Disburses $38.5M for Nimule One-Stop Border Post Phase II — World Bank & TradeMark Africa (TMA) Donor Basket — TradeMark Africa Disburses $38.5M for Nimule One-Stop Border Post Phase II.
    Value: 38500000 USD
    Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no review by a named person.) · Confidence: HIGH
    Source: TradeMark Africa Project Progress Report Q3 2026 · Dated: 2026-09-01
  • IFC Closes $52M Debt & Equity Package for Gumbo River Port Terminal Modernization — International Finance Corporation (IFC) & AGL Equity Consortia — IFC Closes $52M Debt & Equity Package for Gumbo River Port Terminal Modernization.
    Value: 52000000 USD
    Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no review by a named person.) · Confidence: HIGH
    Source: IFC Board Approval Minutes Disclosure #48102 · Dated: 2026-08-25
  • Nimule-Juba 192km Corridor One-Stop Border Post (OSBP) & Digital Gateways — Nimule-Juba 192km Corridor One-Stop Border Post (OSBP) & Digital Gateways in Transport & Logistics, stage Under Construction.
    Value: 38500000 USD
    Evidence state: ANNOUNCED (Not asserted: no named source, no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
    Source: South Sudan Revenue Authority (SSRA) Customs Division · Date not recorded
  • Gumbo Inland River Port Modernization & Bulk Container Terminal — Gumbo Inland River Port Modernization & Bulk Container Terminal in Transport & Logistics, stage Financing Closed.
    Value: 52000000 USD
    Evidence state: ANNOUNCED (Not asserted: no named source, no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
    Source: Ministry of Transport River Navigation Directorate · Date not recorded
  • Juba Modern Commercial Logistics Park & Cold Storage Hub — Juba Modern Commercial Logistics Park & Cold Storage Hub in Transport & Logistics, stage Feasibility / Due Diligence.
    Value: 24000000 USD
    Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: MEDIUM
    Source: Trinity Private Projects Division · Date not recorded
    Method: Value estimated by SSIP, not published by the sponsor.
  • Public Tender: Juba City Arterial Roads Asphalt Rehabilitation (Lot 3: Gudele-Luri 14km) — Public Tender: Juba City Arterial Roads Asphalt Rehabilitation (Lot 3: Gudele-Luri 14km) in Roads & Infrastructure, stage Tender Open.
    Value: 22500000 USD
    Evidence state: ANNOUNCED (Not asserted: no named source, no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: HIGH
    Source: South Sudan Roads Authority (SSRA) · Date not recorded
  • Juba-Rumbek-Wau National Paved Highway Construction (Sections 2 & 3) — Juba-Rumbek-Wau National Paved Highway Construction (Sections 2 & 3) led by Ministry of Roads and Bridges.
    Value: 711000000 USD
    Evidence state: ANNOUNCED (Not asserted: no date, no review by a named person.) · Confidence: HIGH
    Source: Ministry of Roads and Bridges Annual Infrastructure Report 2025/2026 · Publisher: Ministry of Roads and Bridges · Date not recorded
  • Nimule-Juba Multimodal Trade Corridor & Inland Dry Port Customs Fast-Track Facility — Nimule-Juba Multimodal Trade Corridor & Inland Dry Port Customs Fast-Track Facility — bankability FINANCE_READY.
    Value: 52000000 USD
    Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
    Source: SSIP capital assessment · Date not recorded
    Method: Readiness graded B.
  • Trade and Development Bank (TDB Group) — Trade and Development Bank (TDB Group) states a mandate covering 3 sector(s) in 1 geography(ies). A stated mandate is not money deployed.
    Value: 78000000 USD
    Evidence state: ANNOUNCED (Not asserted: no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
    Source: Trade and Development Bank (TDB Group) · Publisher: Trade and Development Bank (TDB Group) · Date not recorded
    Method: Financing trade and socio-economic infrastructure across COMESA and East Africa member states with structured debt and trade finance solutions.
  • UK Foreign, Commonwealth & Development Office (FCDO) — UK Foreign, Commonwealth & Development Office (FCDO) states a mandate covering 4 sector(s) in 1 geography(ies). A stated mandate is not money deployed.
    Value: 140000000 USD
    Evidence state: ANNOUNCED (Not asserted: no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
    Source: UK Foreign, Commonwealth & Development Office (FCDO) · Publisher: UK Foreign, Commonwealth & Development Office (FCDO) · Date not recorded
    Method: Fostering stability, economic reform, humanitarian assistance, climate adaptation, and open society development in fragile states.
  • Africa Global Logistics South Sudan (formerly Bolloré Transport & Logistics) — Africa Global Logistics South Sudan (formerly Bolloré Transport & Logistics) — Dominant international freight forwarding, customs brokerage, and heavy project logistics operator managing multimodal transport from Mombasa and Port Sudan into Juba..
    Value: 19 USD
    Evidence state: ANNOUNCED (Not asserted: no confidence, no review by a named person.) · Confidence: INSUFFICIENT
    Source: Africa Global Logistics South Sudan (formerly Bolloré Transport & Logistics) (POTENTIAL_PARTNER) · Publisher: Africa Global Logistics South Sudan (formerly Bolloré Transport & Logistics) · Dated: 2026-08-20
  • Nile Transporters & Logistics Ltd — Nile Transporters & Logistics Ltd declares operations in central-equatoria, eastern-equatoria, jonglei, lakes.
    Value: Not held. This is a recorded absence, not a value of zero.
    Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: Nile Transporters & Logistics Ltd · Date not recorded
    Method: 65 Heavy Flatbed Trucks (30-ton capacity) + 4 Nile Barges (1,200 MT total)
  • Upper Nile Marine Shipping Lines — Upper Nile Marine Shipping Lines declares operations in upper-nile, unity, jonglei, central-equatoria.
    Value: Not held. This is a recorded absence, not a value of zero.
    Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: Upper Nile Marine Shipping Lines · Date not recorded
    Method: 6 Push-Tugs + 14 River Cargo Barges operating White Nile and Sobat River waterways
  • Refrigerated Cold-Chain Fleet & Staging Depot (Nimule-Juba Corridor) — Refrigerated Cold-Chain Fleet & Staging Depot (Nimule-Juba Corridor): Post-harvest spoilage and transit heat loss for fresh fruits, vegetables, dairy, and pharmaceuticals on the 192km Nimule-Juba highway exceed 32%, inflating wholesale retail margins..
    Value: $650K – $2.4M (6 Reefer trucks 15-ton, 1,200 pallet solar cold storage hub in Gumbo)
    Evidence state: INFERRED (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person.) · Confidence: HIGH
    Source: South Sudan Food & Drug Authority Cold Chain Audit · Date not recorded
    Method: Konyo Konyo and Suk Libya wholesale fresh produce traders report $2.1M monthly in avoidable spoilage losses, with pharmaceutical importers requiring temperature compliance (2°C–8°C) for vaccine and insulin consignments.
  • Nimule One-Stop Border Post Upgrades Single-Window Clearance; Truck Dwell Time Down to 18 Hours — National Revenue Authority (NRA) deployed digital automated weighbridges and unified EAC electronic manifest verification at Elegu/Nimule, clearing 340 stalled freight trucks within 24 hours.
    Value: 18 Average Truck Dwell Time (Hours)
    Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no confidence, no review by a named person.) · Confidence: INSUFFICIENT
    Source: NRA Customs Telemetry, EAC Single Customs Clearance Log, Nimule Border Observers · Dated: 2026-08-26
    Method: Before 64 hrs, after 18 hrs (-71.8%).
  • Mombasa Port to Juba Highway Freight (40ft Container) — Mombasa Port to Juba Highway Freight (40ft Container) is recorded at $4,850 per 40ft TEU as of 2026-09-10, with a stated 30-day change of 6.2%.
    Value: 4850 USD / 40ft Container
    Evidence state: ESTIMATED (Not asserted: no source locator (reference, URL or publisher), no review by a named person.) · Confidence: HIGH
    Source: Association of South Sudan Freight Forwarders Ledger · Dated: 2026-09-10
    Method: Survey benchmark. Historical trend recorded as RISING.
  • Juba-Rumbek Paved Highway Distance & Completion Status — Two sources make incompatible claims about Juba-Rumbek Paved Highway Distance & Completion Status. SSIP records both positions and resolves neither.
    Value: Not held. This is a recorded absence, not a value of zero.
    Evidence state: DISPUTED (Not asserted: no source locator (reference, URL or publisher), no date, no confidence, no review by a named person.) · Confidence: INSUFFICIENT
    Source: SSIP contradiction register · Date not recorded
    Method: The Ministry includes unpaved but graded sub-base sections and bypass tracks as "operational corridor," while transport logistics operators only classify continuous asphalt paving as completed infrastructure.
  • Juba-Rumbek Paved Highway Distance & Completion Status — position A — Juba-Rumbek highway is 68% completed with 260km of all-weather corridor opened to commercial traffic.
    Value: 260
    Evidence state: DISPUTED (Not asserted: no review by a named person.) · Confidence: MEDIUM
    Source: Ministry of Roads and Bridges Press Release · Publisher: Ministry of Roads and Bridges (MRB) · Dated: 2026-08-15
    Method: Government Press Release. The source states this figure as: "260 km opened / 68% completed".
  • Juba-Rumbek Paved Highway Distance & Completion Status — position B — Continuous asphalt wear-course covers 186km; the remaining 74km consists of compacted marram sub-base with temporary bridges subject to rainy season washouts.
    Value: 186
    Evidence state: DISPUTED (Not asserted: no review by a named person.) · Confidence: HIGH
    Source: South Sudan Drivers Union & Field Verification Team · Publisher: Truck Drivers Federation & Satellite Verification · Dated: 2026-08-22
    Method: Field Engineering Audit. The source states this figure as: "186 km paved asphalt / 47% completed to full spec".

How to read this

Every figure on this page carries an evidence state — Verified, Operational, Announced, Estimated, Inferred, Disputed, Simulated, Reference or Unavailable — and each state has a stated definition. SSIP does not present an estimate as an observation, and it does not record a missing value as zero.

Read the methodology · Open the evidence ledger · See declared gaps

Related

Recorded relationships

22 relationships SSIP holds for this entity, each with the evidence state it is permitted to claim. A relationship is not a fact because it is drawn; it is a claim with a source.

Sector

  • in sector: Juba-Rumbek-Wau National Paved Highway Construction (Sections 2 & 3) [ANNOUNCED]
    The project record classifies this project in "Transport & Roads".
  • in sector: Nimule-Juba 192km Corridor One-Stop Border Post (OSBP) & Digital Gateways [ANNOUNCED]
    The pipeline record classifies this in "Transport & Logistics".
  • in sector: Gumbo Inland River Port Modernization & Bulk Container Terminal [ANNOUNCED]
    The pipeline record classifies this in "Transport & Logistics".
  • in sector: Juba Modern Commercial Logistics Park & Cold Storage Hub [ANNOUNCED]
    The pipeline record classifies this in "Transport & Logistics".
  • in sector: Public Tender: Juba City Arterial Roads Asphalt Rehabilitation (Lot 3: Gudele-Luri 14km) [ANNOUNCED]
    The pipeline record classifies this in "Roads & Infrastructure".
  • in sector: TradeMark Africa Disburses $38.5M for Nimule One-Stop Border Post Phase II [ANNOUNCED]
    The capital event record classifies it in "Transport & Logistics".
  • in sector: IFC Closes $52M Debt & Equity Package for Gumbo River Port Terminal Modernization [ANNOUNCED]
    The capital event record classifies it in "Transport & Logistics".
  • in sector: Nimule-Juba Freight Corridor Electronic Cargo Tracking & Weighbridge Upgrade [ANNOUNCED]
    The tender record classifies it in "Transport & Logistics".
  • in sector: Dry Season Bulk River Barge & Truck Fleet Transport Long-Term Agreement (LTA) [ANNOUNCED]
    The tender record classifies it in "Transport & Logistics".
  • targets sector: World Bank (IDA) [ANNOUNCED, announced]
    "World Bank Group (IDA / IFC / MIGA)" lists "TRADE_CORRIDORS_LOGISTICS" among its target sectors. This is a stated mandate, not money deployed.
  • targets sector: African Development Bank Group [ANNOUNCED, announced]
    "African Development Bank Group (AfDB / ADF)" lists "TRADE_CORRIDORS_LOGISTICS" among its target sectors. This is a stated mandate, not money deployed.
  • targets sector: Trade and Development Bank (TDB Group) [ANNOUNCED, announced]
    "Trade and Development Bank (TDB Group)" lists "TRADE_CORRIDORS_LOGISTICS" among its target sectors. This is a stated mandate, not money deployed.
  • targets sector: UK Foreign, Commonwealth & Development Office (FCDO) [ANNOUNCED, announced]
    "UK Foreign, Commonwealth & Development Office (FCDO)" lists "TRADE_CORRIDORS_LOGISTICS" among its target sectors. This is a stated mandate, not money deployed.
  • targets sector: International Finance Corporation (IFC) & MIGA [ANNOUNCED, announced]
    "International Finance Corporation (IFC) & MIGA" lists "TRADE_CORRIDORS_LOGISTICS" among its target sectors. This is a stated mandate, not money deployed.
  • in sector: Africa Global Logistics (AGL) South Sudan [ANNOUNCED]
    The organisation profile classifies it in "Transport & Freight Forwarding".
  • in sector: Nile Transporters & Logistics Ltd [ANNOUNCED]
    The supplier record categorises it as "TRANSPORT_LOGISTICS".
  • in sector: Upper Nile Marine Shipping Lines [ANNOUNCED]
    The supplier record categorises it as "TRANSPORT_LOGISTICS".
  • in sector: Nimule-Juba Multimodal Trade Corridor & Inland Dry Port Customs Fast-Track Facility [ANNOUNCED]
    The capital opportunity record categorises it as "TRADE_CORRIDORS_LOGISTICS".
  • in sector: Refrigerated Cold-Chain Fleet & Staging Depot (Nimule-Juba Corridor) [INFERRED]
    The opportunity record classifies it in "Transport & Logistics".
  • competes in: Standard dry cargo freight operators (unrefrigerated) [INFERRED]
    "Standard dry cargo freight operators (unrefrigerated)" is named as a key incumbent in the market analysis for "Refrigerated Cold-Chain Fleet & Staging Depot (Nimule-Juba Corridor)". This is an analyst's reading of the market, not an attributed statement about the company.
  • competes in: Bolloré/AGL (General freight, limited reefer) [INFERRED]
    "Bolloré/AGL (General freight, limited reefer)" is named as a key incumbent in the market analysis for "Refrigerated Cold-Chain Fleet & Staging Depot (Nimule-Juba Corridor)". This is an analyst's reading of the market, not an attributed statement about the company.
  • targets sector: TradeMark Africa [INFERRED, announced]
    "TradeMark Africa (FCDO / EU / Netherlands Pool)" is recorded as in active engagement on "Nimule-Juba Multimodal Trade Corridor & Inland Dry Port Customs Fast-Track Facility" with a model match score of 92. SSIP records this as stated sector intent, not as funding: no award, contract or disbursement is evidenced.

Explore this in the knowledge graph

Elsewhere in SSIP

All evidence-backed pages · Organisations · Projects · Knowledge graph · Evidence ledger

Topic hubs

Cite, check and correct

Cite as: “Transport & Logistics — Sector evidence”. Strategic Systems Intelligence. https://ssintelligence.online/sectors/transport-logistics. Last updated . Carry the evidence state with any figure you quote.

Methodology · Sources · Corrections — if a record here is wrong, the corrections log is where it is fixed in public.