Commercial diesel generator operating cost

Blended fuel and maintenance cost of self-generated electricity for a commercial facility in greater Juba, per kilowatt-hour, computed by the source at a 250 kVA set on a 65 per cent load factor.

Unit: USD per kWh · Measurement: PRICE · Scope: CITY · Comparability group: SELF_GENERATION_COST_USD_KWH_JUBA

What this is not

Almost every serious error in operational data is a category error rather than an arithmetic one. These are the things this indicator shares a unit with and must never be combined with.

  • The grid tariff, which the source records separately and which is lower but available only part of the day.
  • A national electricity price. This is what a Juba commercial operator pays to make its own power.

How current a reading has to be

Current within 45 days, usable within 120 days, measured against the 2026-09-23 build rather than against the time you read this page. A static deployment cannot re-age itself, so the build date is the honest anchor.

Imported construction inputs and bulk fuel reprice on shipment and customs cycles of roughly a month. They do not move daily, and a six-week-old depot rate remains a usable planning figure.

Readings held (1)

  • 0.44 USD per kWh — observed 2026-09-09, 14 days before the 2026-09-23 build
    Source: Juba Chamber of Commerce Industrial Energy Audit · Greater Juba Commercial Facilities (named only — no coordinate held) · Current · ESTIMATED · evidence ev-00453
    As the source states it: “$0.44 / kWh”

What SSIP says about it

  • Commercial diesel generator operating cost: 0.44 USD per kWh, recorded 2026-09-09 by Juba Chamber of Commerce Industrial Energy Audit. Inside this indicator's 45-day currency window as of 2026-09-23.
    Rule: Take the most recent dated observation bound to this indicator and classify its age against the indicator's own freshness policy (45 days current, 120 days usable — Imported construction inputs and bulk fuel reprice on shipment and customs cycles of roughly a month. They do not move daily, and a six-week-old depot rate remains a usable planning figure.).
    Does not establish: That the condition still holds today. This is the most recent reading SSIP holds, not a statement about 2026-09-23. The grid tariff, which the source records separately and which is lower but available only part of the day.

What SSIP does not hold

  • Derived by the source from a fuel price and an assumed load factor; it is an engineering estimate, not a metered cost.
  • The grid tariff and daily availability hours stated in the source note are deliberately not extracted as separate readings.

How to read this

Every figure on this page carries an evidence state — Verified, Operational, Announced, Estimated, Inferred, Disputed, Simulated, Reference or Unavailable — and each state has a stated definition. SSIP does not present an estimate as an observation, and it does not record a missing value as zero.

Read the methodology · Open the evidence ledger · See declared gaps

Related

All operational indicators · Operating picture · Coverage · Recorded changes · Evidence ledger

Topic hubs

Cite, check and correct

Cite as: “Commercial diesel generator operating cost”. Strategic Systems Intelligence. https://ssintelligence.online/indicators/cost-genset-kwh. Last updated . Carry the evidence state with any figure you quote.

Methodology · Sources · Corrections — if a record here is wrong, the corrections log is where it is fixed in public.