Recorded changes feed (product.changes)
5 evidence records SSIP holds for Recorded changes feed, a South Sudan dataset — dataset coverage across 1 dataset, each with its source, date and evidence state.
What SSIP holds for product.changes
- 5 evidence records
- 5 carry a recorded value; 0 do not
- Evidence states present: 3 ANNOUNCED, 2 OPERATIONAL
- Drawn from 1 dataset: product.changes
This is what SSIP holds, not a claim about what exists. Coverage is concentrated in Juba, Central Equatoria and the Nimule and Nile corridors; outside that scope the corpus is thin.
Evidence records
-
Bank of South Sudan Unifies Auction Spread; Parallel Market Adjusts to 4,450 SSP/$ — The Central Bank injected $12M in FX liquidity to commercial banks at 4,280 SSP/USD, narrowing the spread between official auction and Custom Market parallel rates to 3.8% (down from 14.2% last week).
Value: 4450 Parallel FX Rate (SSP/USD)
Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: INSUFFICIENT
Source: Bank of South Sudan FX Auction Circular BSS/FXD/2026/08 + Juba Custom Market Survey · Dated: 2026-08-26
Method: Before 4,620, after 4,450 (-3.7%). -
Nimule One-Stop Border Post Upgrades Single-Window Clearance; Truck Dwell Time Down to 18 Hours — National Revenue Authority (NRA) deployed digital automated weighbridges and unified EAC electronic manifest verification at Elegu/Nimule, clearing 340 stalled freight trucks within 24 hours.
Value: 18 Average Truck Dwell Time (Hours)
Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: NRA Customs Telemetry, EAC Single Customs Clearance Log, Nimule Border Observers · Dated: 2026-08-26
Method: Before 64 hrs, after 18 hrs (-71.8%). -
Sudd Basin Water Levels Plateau at Lake No; Bentiu Outer Defense Dikes Reinforced to 3.8m — UNOPS and Ministry of Water Resources completed a 4.2 km clay-packed bund reinforcement along Bentiu-Rubkona ring dike, with telemetry sensors showing the crest holding 95 cm above peak surge.
Value: 95 Dike Freeboard Safety Margin (cm)
Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: INSUFFICIENT
Source: Sentinel-2 Synthetic Aperture Radar Inundation Layer + Ministry of Water In-Situ Telemetry · Dated: 2026-08-26
Method: Before 35 cm, after 95 cm (+171.4%). -
Western Equatoria Maize & Cassava Early Harvest Inflow Drops Juba Wholesale Cereal Prices by 6% — First cooperative grain convoys from Yambio and Nzara arrived at Konyo-Konyo and Custom Markets in Juba, delivering 420 metric tons of freshly harvested white maize and dried cassava chips.
Value: 158000 Maize 50kg Bag (SSP at Konyo Konyo)
Evidence state: ANNOUNCED (Not asserted: no source locator (reference, URL or publisher), no date, no review by a named person. It declared VERIFIED; it is shown as an unreviewed import.) · Confidence: INSUFFICIENT
Source: Ministry of Agriculture Crop Assessment Report, Western Equatoria Cooperative Union Sales Ledger · Dated: 2026-08-26
Method: Before 168,000, after 158,000 (-5.9%). -
PetroDar Pipeline Pressure Stabilizes at Pump Station #4 in Heglig Corridor; Output at 142k bpd — Technical field engineers completed thermal insulation repairs and pigging on the 32-inch export pipeline, raising operational crude flow to 142,000 barrels per day.
Value: 142 Crude Export Flow (kbpd)
Evidence state: OPERATIONAL (Not asserted: no source locator (reference, URL or publisher), no confidence, no review by a named person.) · Confidence: INSUFFICIENT
Source: Ministry of Petroleum Daily Dispatch Sheet, Pipeline Pressure Telemetry at Port Sudan Terminal · Dated: 2026-08-26
Method: Before 131 kbpd, after 142 kbpd (+8.4%).
How to read this
Every figure on this page carries an evidence state — Verified, Operational, Announced, Estimated, Inferred, Disputed, Simulated, Reference or Unavailable — and each state has a stated definition. SSIP does not present an estimate as an observation, and it does not record a missing value as zero.
Read the methodology · Open the evidence ledger · See declared gaps
Related
- Central Equatoria (Location)
- Transport & Logistics (Sector)
- Upper Nile (Location)
- Eastern Equatoria (Location)
- Agriculture & Food (Sector)
- Western Equatoria (Location)
- Unity (Location)
- Extractives (Sector)
Elsewhere in SSIP
All evidence-backed pages · Organisations · Projects · Knowledge graph · Evidence ledger
Cite, check and correct
Cite as: “Recorded changes feed — South Sudan dataset”. Strategic Systems Intelligence. https://ssintelligence.online/datasets/product-changes. Last updated . Carry the evidence state with any figure you quote.
Methodology · Sources · Corrections — if a record here is wrong, the corrections log is where it is fixed in public.